Ruiz-Torres AJ and FJ Lopez (2004). “Using the FDH Formulation of DEA to Evaluate a Multi-Criteria Problem in Parallel Machine Scheduling.” Computers and Industrial Engineering 47(2-3): 107-121.

Ruiz-Torres AJ and FJ Lopez (2004). “Using the FDH Formulation of DEA to Evaluate a Multi-Criteria Problem in Parallel Machine Scheduling.” Computers and Industrial Engineering 47(2-3): 107-121.

Leave a Reply